Main Hall and Animal Shade Inaugurated
On 23rd January 2026, Rostwa Engineers formally handed over two completed projects at the Adilang Vocational Training Institute, the AVTI Main Hall and the AVTI Animal Shade Facility. The handover ceremony was held on the AVTI campus in Adilang, Agago District, and brought together the Dongo Paco Foundation board and Rostwa Engineers representatives for the official inauguration of both structures.
The Main Hall
The AVTI Main Hall is the largest communal facility delivered to the institute to date. Designed and constructed by Rostwa Engineers for Dongo Paco Foundation Limited, the hall provides AVTI with a permanent, large-capacity space for assemblies, institutional events, graduation ceremonies, community engagements, and training activities, functions the institute previously had no dedicated infrastructure to host at this scale.
The structure was built to serve not just the current student body but the long-term growth of the institution. From site preparation through to structural works, finishes, and final inspection, the project was managed with precision to ensure what was delivered matched the design intent and the operational needs of AVTI.
For an institution whose purpose is to equip young people in Northern Uganda with practical vocational skills, a hall of this size and quality changes what is possible, not just for the school, but for the wider Adilang community that uses the campus.


The Animal Shade Facility
The second project handed over on the same day was the AVTI Animal Shade Facility, a fenced agricultural enclosure designed to house a range of livestock and birds, incorporating dedicated sections for poultry, goats, cattle, and pigs.
Beyond its function as a livestock facility, the Animal Shade was designed with sustainability at its core. The facility incorporates a waste reuse system, managing animal manure and water in a way that supports the institute’s agricultural activities and reduces environmental impact. The enclosure is self-contained within a perimeter fence, built to accommodate a significant number of animals across its different sections.
This project reflects a broader vision for AVTI as a comprehensive vocational institution, one where students studying agriculture and animal husbandry have access to functional, well-built facilities that mirror real-world practice. Infrastructure built with purpose, designed to teach.
The Handover
The formal handover ceremony marked the conclusion of both projects and the beginning of their operational life. Speeches were delivered by representatives of both Rostwa Engineers and Dongo Paco Foundation, acknowledging the work completed and the significance of both facilities to the institute’s continued development.
Both projects now pass into the hands of AVTI and Dongo Paco Foundation for use.
View the AVTI Main Hall portfolio entry: AVTI View the Animal Shade portfolio entry: Animal
Excellence with Value.

0 comments
Write a comment